Healthcare

The emergency power plant secures power to the entire healthcare facility electrical equipment, in case of grid failure. Emergency power must be available within few seconds to life safety and critical branch loads if a utility failure occurs, to ensure critical procedures are not interrupted.

Healthcare

Power solutions for the Hospital of Careggi in Florence

Project

Request coming from an important Italian customer, looking after the facility management within the Hospital of Careggi, located in Florence.
Due to the enlargement of a section of the building, it was necessary to boost the emergency management through the presence of generators.
Pramac provided soundproofed enclosure gensets equipped with parallel and modular control panel, motorized switches, and separate mains interface panel.

Location Florence
Country Italy (IT)
Size range 2000 – 2600 kVA

Key features

GSW2520P

  • Power LTP - 2380kVA / 1904kWe
  • Power PRP - 2268kVA / 1815kWe
  • Frequency - 50 Hz
  • Tension - 400 V
  • Engine Perkins - 4016-61TRG3 emissioned
  • Alternator - Meccalte ECO46-2L
  • Soundproof enclosure noise level - 77 +/-3 dB(A) @ 7 m
  • Parallel panel

Careggi Hospital0x600.jpg

Back