Power solutions for a hotel in Thailand
PROJECT
The Four Seasons hotel in Bangkok is built along the Chao Praya river, with 73 storeys and a total of 353 units. Since the hotel required a standby solution, critical backup power generators were installed: PRAMAC provided 2 openset generators GCW2520P.
KEY FEATURES
GCW2520P
• Power LTP 2500 kVA
• Power PRP 2250 kVA
• Frequency 50 Hz
• Tension 400 V
• Engine PERKINS 4016-61TRG3
• Alternator MECCALTE ECO46-2LN/4
• Open version
• ACP