Power solutions for a hotel in Equatorial Guinea
PROJECT
One of the leading African companies in the marine projects sector, working in particular in Equatorial Guinea, selected PRAMAC to collaborate in the building of a hotel; PRAMAC provided some 1000kVA generating sets with a separated synchronization panel for the supply of sensitive loads in case of blackout.
KEY FEATURES
GCW1000M
• Power LTP 1009 kVA
• Power PRP 931 kVA
• Frequency 50 Hz
• Tension 400 V
• Engine MTU 16V2000G25
• Alternator MECC ALTE ECO43 2S
• Soundproof enclosure noise level 80 +/-3 dB(A) @ 1m
• External emergency synchronizing panel